New Awarded Project:Bored Tunnel Between Aviation Park Station And Loyang Station

PubDate:2021-03-09

Developer : Land Transport Authority (LTA)  |  Construction Period : 106 months

We are pleased to announce that Taisei Corporation - China State Construction Engineering Corporation Limited Singapore Branch Joint Venture has been awarded one (1) contract from Land Transport Authority (LTA) for Design and Construction of Bored Tunnel Between Aviation Park Station And Loyang Station.

Site Map  |  Legal Statement  |  FAQ  |  Contact Us  |  BCA Quality Mark

©2017-2020 CSCEC ICP 05049820 CSCEC . LTD ICP 08010180