Comparing to the conventional cast in-situ or 2D precast construction method, the PPVC construction allows most of the works, including structure, architecture and M&E, to be done in a more precise and controllable manner in a more favourable factory environment. The PPVC construction method is more productive, safter and more sustainable.
CCDC began using PPVC in 2015, debuting the method in its Lake Grande project, the first reinforced concrete PPVC condominium project in Singapore. In this project, the strong technical strength that CCDC had built up along the way not only made this remarkable and innovative PPVC construction a success, but also guaranteed a high-quality delivery.
Lake Grande Photo & BCA Construction Excellence Award
Sengkang Grand
HDB Tampines Greencourt
JAB the Reserve Residence
Lentor Garden
CCDC founded its DfMA centre in 2021. The centre comprises a dedicated DfMA team, and includes 2 production lines for PPVC/PBU fitting-out works and 1 production line for MEP module prefabrication works. With its own centre and dedicated team,CCDC can further develop the PPVC construction method both in breadth and depth.
CCDC DfMA Center