PPVC

Comparing to the conventional cast in-situ or 2D precast construction method, the PPVC construction allows most of the works, including structure, architecture and M&E, to be done in a more precise and controllable manner in a more favourable factory environment. The PPVC construction method is more productive, safter and more sustainable.

CCDC began using PPVC in 2015, debuting the method in its Lake Grande project, the first reinforced concrete PPVC condominium project in Singapore. In this project, the strong technical strength that CCDC had built up along the way not only made this remarkable and innovative PPVC construction a success, but also guaranteed a high-quality delivery.

4.1 Lake Grande Photo.jpg

1742196167119.jpg

Lake Grande Photo & BCA Construction Excellence Award

1742196521613.jpg

Sengkang Grand

1742196587702.jpg

HDB Tampines Greencourt

4.1 JAB the Reserve Residence.jpg

JAB the Reserve Residence

4.1 Lentor Garden.jpg

Lentor Garden

CCDC founded its DfMA centre in 2021. The centre comprises a dedicated DfMA team, and includes 2 production lines for PPVC/PBU fitting-out works and 1 production line for MEP module prefabrication works. With its own centre and dedicated team,CCDC can further develop the PPVC construction method both in breadth and depth.

1742195538502.jpg

CCDC DfMA Center